Customization: | Available |
---|---|
Customized: | Customized |
Certification: | RoHS, CE, TUV |
Still deciding? Get samples of US$ 5.5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Energy Regulators control temperature by switching the current on or off for shorter or longer intervals. At the highest level, power is continuously supplied. The energy regulators are installed directly behind the control knob. When switched on, a bimetallic strip heats up, changes its shape, and triggers the corresponding contacts. The control knob position determines the distance between the bimetal strip and the controller contact, which allows the current to flow at a correspondingly high rate.
Packaging
1) plastic bag + carton
2) wooden box
Customized instructions:
Dear customer: Hello! Because all the products of our company for the factory are customized products, you need to communicate with the customer service staff to determine the model, specification, color, size, quantity, whether it can be customized and other relevant information, so before the buyer buys any product in the store, please ask the customer service staff about the purchase, thank you for your cooperation!
Q: who are we?
A:We are a factory, we can guarantee our price is first-hand, very cheap and competitive. We are based in Zhejiang, China, start from 2004,sell to all over the world.
Q: how can we guarantee quality?
A: Always a pre-production sample before mass production;
Always final Inspection before shipment;
Q:what can you buy from us?
Energy regulator
Thermostat
Thermometer
Section Switch
Heating element
Leakage current protective plug
Q:How long is your delivery time?
A: Generally it is 2 days if the goods are in stock. or it is 10-20 days if the goods are not in stock, it is according to quantity.
Q:Could you manufacture the products according to my drawing or sample?
A: Yes,we also could manufacture the products according to customer's drawing or replicate sample.